The completed base on November 10th.
Once the carving of the base is finished the piece needs to be disassembled for firing. In order to ensure that it can be reassembled correctly I make a series of marks on the inside as an initial guide.
Before firing each brick needs to be frogged.
The bricks are individually numbered 1 - 160 to ensure they can be reassembled correctly.
Bricks all packed and ready to return to the brickworks for firing.
No comments:
Post a Comment